Contact infomation

icon
  • (04) 6652 4636

    E&R Engineering Consultants Joint Stock Company

    Address: 12th floor, Building at No.6 Ton That Thuyet Street, Cau Giay Dist., Hanoi City, Vietnam

    Tel.: +844.32123467/+844.66524636

    Fax: +84-4.3787 8219

  • Cao Lanh Bridge Project

    Narrative description of Project: Cao Lanh Bridge is the important part of Connectivity Project of Mekong Delta. The project includes 02 Cable-stayed bridges which are Cao Lanh Bridge (across Tien River) and Vam Cong Bridge (across Hau River) with total length of 5000m and 25km of approach road between 2 bridges.Two bridges after finished will replace current ferry at Tien River and Hau River.

    Anh dai dien
    Cao Lanh Bridge is Cable-stayed bridge with two side of cable and 4 lanes for vehicle and 2 lanes for cart vehicle in scale (in the complete stage, it will be arrange for 6 lanes of vehicle).
    Name of Client: CUU LONG CORPORATION FOR INVESTMENT, DEVELOPMENT AND PROJECT MANAGEMENT OF INFRASTRUCTURE
    Scope of consulting service: Provideconsulting servicefor detailed design
    – Making calculation and drawing for I beam bridges, voided slab bridges
    – Making calculation and drawing for 05 Super-T beam bridge, Super-T beam of approach bridge
    – Making calculation and drawing for 02 underpass culverts