Contact infomation

icon
  • (04) 6652 4636

    E&R Engineering Consultants Joint Stock Company

    Address: 12th floor, Building at No.6 Ton That Thuyet Street, Cau Giay Dist., Hanoi City, Vietnam

    Tel.: +844.32123467/+844.66524636

    Fax: +84-4.3787 8219

  • NGUYEN THAI BRIDGE PROJECT

    Nguyen Thai Hoc bridge and the link is built through Rach Gia Canal, Long Xuyen City. The canal of 2 wards My Binh and My Hoa. Location of bridge over existing Nguyen Thai Hoc street;

    – The starting point of the project: At the location adjacent to the junction between the Nguyen Thai Hoc street and Le Van Binh Ward;

    – At the end of the project: At the location adjacent to the junction between the Thai Nguyen Hoc street and Bui van Hoa Ward; – Construction scale: Permanent bridges, load HL93, the design speed of V = 60 km/h

    Name of Client: Department of Transportation of An Giang.

    Description of work within the assignment: Survey Consultancy, feasibility study report