Contact infomation

icon
  • (04) 6652 4636

    E&R Engineering Consultants Joint Stock Company

    Address: 12th floor, Building at No.6 Ton That Thuyet Street, Cau Giay Dist., Hanoi City, Vietnam

    Tel.: +844.32123467/+844.66524636

    Fax: +84-4.3787 8219

  • Projects

    • Lramp Project

      Rural Bridges Construction and Local Road Asset Management Project (LRAMP) include 03 main components as Component 1- recovering and improving local roads (Road component); component 2 – population bridge construction (bridge component) and advisory component.

      The package for survey, technical-economic reports (BL:02-TV:01),  2 component Project (BL:02-BCKTKT:02) construction of the bridge in the Hong Dan district, Bac Lieu province – Lramp Project – Bridge component includes 6.

      The package for survey, technical-economic reports (HAG:2-TV:01),  2 component Project (HAG:02-BCKTKT:02) construction of the bridge in the Phung Hiep district, Chau Thanh A district, Hau Giang province – Lramp Project – Bridge component includes 7. 03 Bridge in Phung Hiep district; 04 03 Bridge in Chau Thanh A district.

      The package for survey, technical-economic reports (TV:07-TV:01),  7 component Project (TV:07-DADT:01) construction of the bridge in the Cau Ngang district, Cau Ke district, Chau Thanh district, Cang Long district and Tra Vinh City, Tra Vinh province – Lramp Project – Bridge component includes 16.

      The package for survey, technical-economic reports (AG:04-TV:04),  4 component Project (AG:04-DADT:01) construction of the bridge in the An Giang province – Lramp Project – Bridge component includes 06.

      Scope of design:

      • Suspension bridge: the design lifespan of 25 years; Bridge width 1.5 m-2.0 m; The crew load sprayed all 300 kg/m.
      • Hard Bridge: 3, 5 m Bridge width + 2 * 0, 25 m (level A), 3, m + 2 * 0, 25 m (level B), 2, m + 2 * 0, 25 m (level C); clearance navigation: the absence of hierarchy that needs minimal navigation B = 6 m x H = 1, 5 m

      Name of Client: Project Management Unit 6.

      Description of work within the assignment:

      • Survey Consultancy, feasibility study report.
      • Construction drawing design.

    • A1 Package, Ben Luc – Long Thanh Expressway Project

      General description of the Project:

      Ben Luc – Long Thanh Expressway with total length of 57km, goes across Ho Chi Minh City (26.4 km), Dong Nai province (28km) and Long An province (2.7km). This is an important role on developing the socioeconomic activities in the provinces and cities around Ho Chi Minh City. Readmore

    • Noi Bai – Lao Cai Expressway Project

      Narrative description of Project: Noi Bai – Lao Cai expressway is a particularly important project belonging to Kunming – Hai Phong Transport Corridor, under co-operation program between 6 countries of Greater Mekong sub-region (GMS). Readmore

    • Cao Lanh Bridge Project

      Narrative description of Project: Cao Lanh Bridge is the important part of Connectivity Project of Mekong Delta. The project includes 02 Cable-stayed bridges which are Cao Lanh Bridge (across Tien River) and Vam Cong Bridge (across Hau River) with total length of 5000m and 25km of approach road between 2 bridges. Readmore

    • Vinh Thinh Bridge Project

      Narrative description of Project: Bridge cross Red River connecting Son Tay Town with Vinh Tuong District (Vinh Phuc Province), place in National Road 2C, belong to Ring Road No.5 of Ha Noi City. After complete, this bridge will be connect to some expressway as: Noi Bai-Lao Cai Expressway, Ho Chi Minh Road. It contribute to promote socioeconomic development of satellite towns of Ha Noi City. Readmore

    • Da Nang – QuangNgai Expressway Project

      Narrative description of Project: Da Nang – QuangNgai expressway project is a part of North South expressway project in the central area and confirmed by the government that the project is invested priory by World Bank’s fund (WB). The project is constructed to improve the connection of internal area; support to develop the economy and society of the whole country and the central area. Readmore