Rural Bridges Construction and Local Road Asset Management Project (LRAMP) include 03 main components as Component 1- recovering and improving local roads (Road component); component 2 – population bridge construction (bridge component) and advisory component.
The package for survey, technical-economic reports (BL:02-TV:01), 2 component Project (BL:02-BCKTKT:02) construction of the bridge in the Hong Dan district, Bac Lieu province – Lramp Project – Bridge component includes 6.
The package for survey, technical-economic reports (HAG:2-TV:01), 2 component Project (HAG:02-BCKTKT:02) construction of the bridge in the Phung Hiep district, Chau Thanh A district, Hau Giang province – Lramp Project – Bridge component includes 7. 03 Bridge in Phung Hiep district; 04 03 Bridge in Chau Thanh A district.
The package for survey, technical-economic reports (TV:07-TV:01), 7 component Project (TV:07-DADT:01) construction of the bridge in the Cau Ngang district, Cau Ke district, Chau Thanh district, Cang Long district and Tra Vinh City, Tra Vinh province – Lramp Project – Bridge component includes 16.
The package for survey, technical-economic reports (AG:04-TV:04), 4 component Project (AG:04-DADT:01) construction of the bridge in the An Giang province – Lramp Project – Bridge component includes 06.
Scope of design:
- Suspension bridge: the design lifespan of 25 years; Bridge width 1.5 m-2.0 m; The crew load sprayed all 300 kg/m.
- Hard Bridge: 3, 5 m Bridge width + 2 * 0, 25 m (level A), 3, m + 2 * 0, 25 m (level B), 2, m + 2 * 0, 25 m (level C); clearance navigation: the absence of hierarchy that needs minimal navigation B = 6 m x H = 1, 5 m
Name of Client: Project Management Unit 6.
Description of work within the assignment:
- Survey Consultancy, feasibility study report.
- Construction drawing design.